Skip to Content

Asyad Group Demonstrates Shipping Prowess with Landmark Gas Turbine Delivery

  • Asyad Group logistics operations successfully delivered trimodal shipment for Petroleum Development Oman from Belgium to Oman, demonstrating its outstanding capabilities in managing complex logistics operations of major Project Cargo shipments.
  • Connecting businesses globally by seamlessly integrating sea, air, and road transport, and playing a crucial role in facilitating efficient and timely deliveries both within Oman and beyond.
  • Recognizing the distinctive demands and scale of industrial cargo linked to the energy sector, Asyad Group is orchestrating a robust global network fostering a conducive ecosystem for major energy and industrial projects
  • The Group’s world-class logistics operation, customer focus and extensive global network have positioned it as a leader in this field, playing a pivotal role in facilitating major projects in Oman and beyond.

 

In a remarkable major operation that proves Asyad Group’s capabilities and leadership in transforming logistics in Oman, Asyad has cemented its position as a regional logistics powerhouse with the successful completion of a complex trimodal shipment for Petroleum Development Oman (PDO). This achievement highlights the company's ability to handle complex projects and showcases its commitment to delivering exceptional logistics solutions.

 

This extensive logistical integration, encompassing the seamless end-to-end handling and transportation of a gas turbine weighing over 200 Ton gas turbine from Port of Antwerp in Belgium to Port of Duqm, showcases Asyad‘s unparalleled project management and technical capabilities in breakbulk operations for mega projects.

 

Juma Al Maskari, Director of Asyad Logistics services, emphasized Asyads’ dedication to meeting the unique requirements of its clients. "Our collaboration with PDO exemplifies our ability to tailor our services to specific needs," he stated. "As the leading logistics provider in the region, we are committed to connecting businesses to new opportunities and expanding their global reach."

 

Asyad Group has built a robust international network with Oman at its core strategic global presence. A key asset in this network is the state-of-the-art cargo terminal at the Port of Duqm. Its strategically located facilities, at the crossroads of trade between India, MENA, and Europe, enable Asyad to deliver resilient logistics solutions to the global marketplace.

 

The Group plays a pivotal role in creating In-Country Value (ICV) by supporting local businesses, contributing to the success of key national projects and driving sustainable growth within Oman. Further, through its global logistics networks, Asyad seamlessly connects businesses globally, enhancing the speed and efficiency of deliveries within Oman and beyond.

Other news

Asyad’s Integrated Logistics Strengthens Duqm’s Connectivity to Global Markets

Asyad Group continues to enhance the strategic role of Duqm Port and its connectivity to regional and international markets through an integrated logistics ecosystem that brings together operations at Asyad Container Terminal in Duqm, the global network of Asyad Lines, and Asyad Shipping. This seamless integration boosts the efficiency of cargo flows to and from Oman’s ports and reinforces Duqm’s position as an open gateway to the Indian Ocean and major global trade routes.

Read more

Asyad Group Demonstrates Logistics Excellence for Energy Sector at ADIPEC 2025

Asyad Group, the global integrated logistics provider, will set the agenda for energy logistics at ADIPEC 2025 in Abu Dhabi, that is held in Abu Dhabi from 3-6 November. The Group will showcase a comprehensive model of its logistics ecosystem and the pivotal role it plays in enabling energy supply chains and global trade.

Read more

Hafeet Rail Achieves Major Construction Milestones as Oman–UAE Joint Railway Project Progresses on Schedule

Hafeet Rail, the developer and operator of the Oman–UAE Joint Railway Network, has announced a series of key milestones in the construction of the landmark cross-border project, confirming that work remains firmly on track and on schedule.

Read more